Author: Chang, Y.-T.
Paper Title Page
WEPGF019 Database Applications Development of the TPS Control System 1
 
  • Y.-S. Cheng, Y.-T. Chang, J. Chen, P.C. Chiu, K.T. Hsu, C.H. Huang, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  The control system had been established for the new 3 GeV synchrotron light source (Taiwan Photon Source, TPS) which was successful to commission at December 2014. Various control system platforms with the EPICS framework had been implemented and commissioned. The relational database (RDB) has been set up for some of the TPS control system applications used. The EPICS data archive systems are necessary to be built to record various machine parameters and status information into the RDB for long time logging. The specific applications have been developed to analyze the archived data which retrieved from the RDB. One EPICS alarm system is necessary to be set up to monitor sub-system status and record detail information into the RDB if the problem happened. Some Web-based applications with RDB have been gradually created to show the TPS machine status related information. The efforts are described at this paper.  
poster icon Poster WEPGF019 [4.003 MB]  
 
FRB3O01 Commissioning of the TPS Control System 1
 
  • C.Y. Liao, Y.-T. Chang, J. Chen, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, S.Y. Hsu, K.H. Hu, C.H. Huang, C.H. Kuo, D. Lee, C.-J. Wang, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  Con¬trol sys¬tem for the Tai¬wan Pho¬ton Source (TPS) has been completed in 2014. Com¬missioning of the accelerator system is in proceeding. Electron beam were stored at the stor¬age ring and emit first light in De¬cem¬ber 31, 2014. TPS con¬trol sys¬tem adopts EPICS toolk¬its as its frame¬works. The sub¬sys¬tems con¬trol in¬ter¬faces in¬clude event based tim¬ing sys¬tem, Eth¬er¬net based power sup¬ply con¬trol, cor¬rec¬tor power sup¬ply con¬trol, PLC-based pulse mag¬net power sup¬ply con¬trol and ma¬chine pro¬tec¬tion system, in¬ser¬tion de¬vices mo¬tion con¬trol sys¬tem, var¬i¬ous di¬ag¬nos¬tics re¬lated con¬trol en¬vi¬ron¬ment, and etc. The stan¬dard hard¬ware com¬po¬nents had been in¬stalled and inte¬grated, and the var¬i¬ous IOCs (Input Out¬put Con¬troller) had been im¬ple¬mented as var¬i¬ous sub¬sys¬tems con¬trol platforms. Low level and high level hard¬ware and software are tested in¬ten¬sively in 2014 and final re¬vise to pre¬pare for rou¬tine op¬er¬a¬tion is under way. Ef¬forts will be sum¬ma¬rized at this paper.